me

Marc Romero Codina.

- 2000 hours Certified of highter education in edification and civil construction.
- 2000 hours Certified of highter education in professional risks prevention.
- Micropiles execution
- Auscultation and treatment of surfaces
- Modifications in quality control introduced by EHE-08 in structural concrete
- Polyurethane aplications
- Projected polyurethane
- Energetic certification of existing buildings.
- Future Cities
- The Engineering of Structures Around Us
- Introduction to the sustainable construction

Experience
- 2014 - 2015 senior consultant at reform of Diagonal Avenue at Barcelona (BAC Engineering Consultancy Group)
- 2013 installation technician at IM3
- 2008 - 2010 senior consultant at construction of the bus-vao road in Barcelona (PaymaCotas)
- 2007 - 2008 project manager in Cycons. S.L.U.
- 2006-2007 drawer at Taller d'Arquitectura Xavier Esteve


mracroco@hotmail.com
https://twitter.com/arquimund


Thursday, 16 January 2014

Project: library


This is the project in which we develope a library as a singular building, but in this construction we will find more spaces than just a library.
The place of this building is a two-levels terrain and the build will be situated at the higher level and flying over the lower level.
The design is an "square donnut" with two floors.

 floor plans

Section

Elevation

We can get into the building passing trought the main door at one of the facades of the interior "hole" after we walked under the first part of the library.



Once in, we find the information point and the w.c.'s.
If we walk to the left, we enter to the main library. It's a double-space room with work places at the two levels with a hight amount of natural light due to the top part of the facades are made of glass.  
Walking to the right, the first stop of the way is the kids library, an special space for the learning and fun of the children without disturbing the adults.
We keep walking head to the multipurpose room, ready for theaching, meetings, essays, etc...
and over this last space, at the upstairs, there are the "group-work" rooms. These rooms may be rented by groups of people who need to work together.
Part of the second floor is destinated to a terrace, a good place to take a brake during the work time.







No comments:

Post a Comment