me

Marc Romero Codina.

- 2000 hours Certified of highter education in edification and civil construction.
- 2000 hours Certified of highter education in professional risks prevention.
- Micropiles execution
- Auscultation and treatment of surfaces
- Modifications in quality control introduced by EHE-08 in structural concrete
- Polyurethane aplications
- Projected polyurethane
- Energetic certification of existing buildings.
- Future Cities
- The Engineering of Structures Around Us
- Introduction to the sustainable construction

Experience
- 2014 - 2015 senior consultant at reform of Diagonal Avenue at Barcelona (BAC Engineering Consultancy Group)
- 2013 installation technician at IM3
- 2008 - 2010 senior consultant at construction of the bus-vao road in Barcelona (PaymaCotas)
- 2007 - 2008 project manager in Cycons. S.L.U.
- 2006-2007 drawer at Taller d'Arquitectura Xavier Esteve


mracroco@hotmail.com
https://twitter.com/arquimund


Monday, 18 November 2013

project: museum


The building developed in this project is a mesum with two showrooms. This is an easy configuration because we worked about two open spaces to fill with the expos.

floorplan

 section

 elevations

The main room is basicaly thought to welcome the paintings and sculpture with an important colour composition and that's why the entry of natural light is limited. The different light during the day modifies the colours of the works of art so we thought that is better to use mainly a constant and artificial light.

This space is in an irregular building with the main facade in an inclined position and there is where we find the entry to the museum. We get into the museum throught the floor because the upstairs start under the building  from the street and there is an horizontal door which bring us to the reception.
In this space we find the wc's too and the remaining space is for the expo in two different levels linked by stairs.


The other space is a full natural light space because the walls and the roof are made of glass. This showroom was thought as a polyvalent room. The showroom is in a lower level but all the perimeter is at the roof 0 and that's let us to look the outside.

The offices would be in a different building to keep the design of the building as we see in this project.   



No comments:

Post a Comment