me

Marc Romero Codina.

- 2000 hours Certified of highter education in edification and civil construction.
- 2000 hours Certified of highter education in professional risks prevention.
- Micropiles execution
- Auscultation and treatment of surfaces
- Modifications in quality control introduced by EHE-08 in structural concrete
- Polyurethane aplications
- Projected polyurethane
- Energetic certification of existing buildings.
- Future Cities
- The Engineering of Structures Around Us
- Introduction to the sustainable construction

Experience
- 2014 - 2015 senior consultant at reform of Diagonal Avenue at Barcelona (BAC Engineering Consultancy Group)
- 2013 installation technician at IM3
- 2008 - 2010 senior consultant at construction of the bus-vao road in Barcelona (PaymaCotas)
- 2007 - 2008 project manager in Cycons. S.L.U.
- 2006-2007 drawer at Taller d'Arquitectura Xavier Esteve


mracroco@hotmail.com
https://twitter.com/arquimund


Tuesday, 1 October 2013

Project: climbing wall

This project tries to convert an unused industrial building at a climbing wall.

The building was elected by the client and it has 35 meters lengh, 10 meters wide and 8 meters hight. This form is not the best to install this kind of business due to the building is too long but, after some thinking, I thought we found a good solution.


 Planes

Made with the initial construction, we find the offices at the first floor, obiously, these doesn't occupy all the area and are almost square (10mx10m). We will condition this floor to situate the dressers for men and women and we will use the roof of the fitness room we will construct in roof 0 as a terrace. This terrace will have views to the climbing zone.


 Terrace

At the floor 0, entering to the building, we will install the bar with a warehouse and a wc conditioned for disableds. If we keep walking throught the room, we will construct a fitness room (43m2) and, filling the same wall, a boulder with a cave. In front of this equipment, at the opposite wall and taken part of the back wall, we will raise the hight climbing walls, almost 30 meters to fill with equipment.

The building has 2 yards, one at main facade and the other crossing the back wall. Because of the rules, we can't construct anything at this yards so we will remain these to make some outdoor activities.



 General views