me

Marc Romero Codina.

- 2000 hours Certified of highter education in edification and civil construction.
- 2000 hours Certified of highter education in professional risks prevention.
- Micropiles execution
- Auscultation and treatment of surfaces
- Modifications in quality control introduced by EHE-08 in structural concrete
- Polyurethane aplications
- Projected polyurethane
- Energetic certification of existing buildings.
- Future Cities
- The Engineering of Structures Around Us
- Introduction to the sustainable construction

Experience
- 2014 - 2015 senior consultant at reform of Diagonal Avenue at Barcelona (BAC Engineering Consultancy Group)
- 2013 installation technician at IM3
- 2008 - 2010 senior consultant at construction of the bus-vao road in Barcelona (PaymaCotas)
- 2007 - 2008 project manager in Cycons. S.L.U.
- 2006-2007 drawer at Taller d'Arquitectura Xavier Esteve


mracroco@hotmail.com
https://twitter.com/arquimund


Monday, 3 March 2014

project: students comunity




The reason for this post is an students comunity, 84 flats distributed in 14 buildings and destinated to people who is studying and, maybe, with a low budget.
The concept for each building is: - 6 complete rooms with wc, bed and studying zone at floors 0, 1 and 3.
                                                  - 1 comunitary kitchen at floor 2
                                                  - 1 laundry at floor 4 with terrace

 floorplants

 elevations

We can see 2 volumes for each building. With a wood aspect, there is the crowd of rooms, kitchen and laundry and, glued to this, closed with glass, there is the stairs core with a lift.


The rooms have natural light due to the main window at the back facade and a another window that looks to the stairs core. It's important to remember that the stairs are closed by glass and that's why this window receive natural light.



Inside the rooms, the studying zone and the sleeping zone are separated by the full wc with a sink, toilet, bidet and shower. The rooms have a microwave and a little freezer.





The kitchen counts with 3 hotplates, 3 sinks and two freezers, able to let the people of the building prepare their food easily and quickly.
The last floor, the laundry, has three washer, three dryer and a terrace for hanging laundry and take a break during the studying day.
The crowd of buindings create an interior square. It is an oval green space for all the students who are living in this flats.